Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a road / highway in Aurora, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Update:https://www.aurora.il.us/files/sharedassets/mainsite/v/1/finance/documents/budget/city-of-aurora-cip-2026-2035.pdf Resurfacing of E Galena Blvd from East of E Park Pl to Ohio Street turning north on Ohio to East New York Street and continuing west on East New York to Union St utilizing Surface Transportation Program (STP) federal funds administered through Kane-Kendall Council of Mayors (KKCOM). The federal participation for the project will be 75% of construction costs, up to a maximum of $750,000. The Illinois Department of Transportation (IDOT) will front-fund the cost of construction and invoice the city for its 25% share and beyond the federal maximum participation amount. The costs to be paid by the city are reflected below. Phase I & Phase II will be completed in-house by city engineering staff with possible drafting assistance by a consultant. Project is included in City of Aurora Fiscal Year 2026-2035 Page no 234 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.aurora-il.org/DocumentCenter/View/13219/Capital-Improvements-Plan-2024-2033 Resurfacing of E Galena Blvd from East of E Park PI to Ohio Street turning north on Ohio to East New York Street and continuing west on East New York to Union St utilizing STP (Surface Transportation Program) federal funds administered through KKCOM (Kane-Kendall Council of Mayors). The federal participation for the project will be 75% of construction costs, up to a maximum of $750,000. The Illinois Department of Transportation (IDOT) will front-fund the cost of construction and invoice the city for its 25% share and beyond the federal maximum participation amount. The costs to be paid by the city are reflected below. Phase I & Phase II will be completed in-house by city engineering staff with possible drafting assistance by a consultant. Construction is expected to begin in 2026. Project is included City of Aurora Fiscal Year 2024-2033 Page no 276 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope of work has not been determined. As of May 17, 2023, this project is included in the City of Aurora's FY 2023-2032 CIP and funding is allotted for FY 2025 and FY 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$672,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
Multiple Locations, Aurora, IL
Related To This Project
Aurora, IL
Bid Date: May 31 2023
Aurora, IL
Bid Date: Jun 16 2023
Aurora, IL
Bid Date: May 31 2023
Aurora, IL
Bid Date: May 31 2023
Aurora, IL
Bid Date: Jun 01 2023
Aurora, IL
Bid Date: Jun 12 2023
Aurora, IL
Bid Date: Jun 16 2023
Aurora, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
