Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 28, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a mixed-use development in Aurora, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Construction of a new entrance, entrance road, and auto parking lot in the northeast quadrant of the airport. This project consists of earthwork, bituminous asphalt paving, watermain and fire protection work, electrical and lighting, new fence and gates, stormwater work, and pavement marking. The project is included in the City's 2026-2035 Capital Improvement Program (CIP). As of April 28,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.. Update:https://www.aurora.il.us/files/sharedassets/mainsite/v/1/finance/documents/budget/2025-capital-improvement-plan-2025-2034.pdf Construction of a new entrance, entrance road, and auto parking lot in the northeast quadrant of the airport. This project consists of earthwork, bituminous asphalt paving, watermain and fire protection work, electrical and lighting, new fence and gates, stormwater work, and pavement marking. Project is included City of Aurora Fiscal Year 2025- 2034 page No :136 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.aurora-il.org/DocumentCenter/View/13219/Capital-Improvements-Plan-2024-2033 Construction of a new entrance, entrance road, and auto parking lot in the northeast quadrant of the airport. This project consists of earthwork, bituminous asphalt paving, watermain and fire protection work, electrical and lighting, new fence and gates, stormwater work, and pavement marking. Project is include City of Aurora Fiscal Year 2024-2033 CIP ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope of work has not been determined. As of May 17, 2023, this project is included in the City of Aurora's FY 2023-2032 CIP and funding is allotted for FY 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$4,312,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2028
Multiple Locations, Aurora, IL
Related To This Project
Aurora, IL
Bid Date: May 31 2023
Aurora, IL
Bid Date: Jun 16 2023
Aurora, IL
Bid Date: May 31 2023
Aurora, IL
--
Aurora, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
