BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Palm Desert, California. Conceptual plans call for site work for a water / sewer project.

CVWD s Engineering Department is requesting formal proposals from consultants to prepare final plans, specifications, and cost estimates for the Airport Boulevard/Valley View Water Transmission Main and Sewer Improvements project (Project). The Project work scope includes utility research, survey, potholing, right-of-way research and acquisition of necessary pipeline easements (including preparation of legal descriptions and plats), geotechnical services, identification of alternatives and preferred pipeline alignments, final design documents, specifications, cost estimates, and permits for: 1. A proposed 30-inch diameter water transmission main and 12-inch to 8-inch diameter distribution mains generally located along Airport Boulevard and 57th Avenue near Highway 86 in the eastern Coachella Valley in Riverside County. 2. The design effort shall include plans and specifications for master meter connections, fire protection, and tie-in connections to the existing onsite water systems for the thirteen mobile home parks, including associated improvements and/or abandonments of existing onsite pipelines, wells, etc. 3. A proposed offsite improvements include a new sewer lift station, 16,150 feet of 8-inch and 10-inch diameter gravity sewer pipeline along portions of Ave 57, Fillmore Street, Desert Cactus, Airport Blvd and Soto Street and lateral connections to connect these same communities to CVWD s sanitation system. The new sewage lift station would be constructed east of State Route 111 and the Coachella Valley Stormwater Channel, just south of Avenue 57 and from there, 1,550 linear feet of 6-inch diameter force main would be constructed to connect to CVWD s existing sewer pipeline at the intersection of State Route 111 and Church Street. The design effort needs to include onsite improvements and laterals needed to convey flows from the mobile home parks to the offsite sewer main. 4. It is expected that the water and sewer improvements will be constructed in up to three phases each over time as funding becomes available. Therefore, the selected consultant will be required to ensure that both the water and sewer improvement plans can be assembled into three separate bid packages each if needed. Please refer to the attached exhibit for the project limits. Q&A Deadline 03/17/2022 4:00 PM (PST) . Start/Delivery Date May 9, 2022 Project Duration Anticipated completion by June 30, 2023. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
45
Bidding Soon
879
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2022

img_map_placeholder

Multiple Locations, Palm Desert, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.