BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Hoopeston, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The project consists of providing a Cafeteria Addition to the Middle School, and replacing 7 existing multi-zone roof top units with 43 single zone roof top units, and replacing a heating only roof mounted makeup air unit. This work will include new ceilings and lights in the area of the new roof top units, removing the old multi-zone units and their ductwork, and the existing lights. The existing ceiling shall be removed by a separate abatement project. Prevailing wages in accordance with Vermillion County is required. Bid security is required, in the form of a bid bond or certifi ed check in an amount equal to ten percent (10%) of the base bid as guarantee that the bid will not be withdrawn within 30 days after the date of opening of bids, and that the successful bidder will enter into a Contract for the work awarded to them. Bid security shall be made payable to Hoopeston Area CUSD #11 Bonds are required: Both a Performance Bond and a Labor and Payment Bond are required for this project, each in an amount equal to 100% of the contract price. Your Bid will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the owner. Award of a contract is anticipated to occur at the March 17, 2022 meeting of the Board of Education. Begin construction on June 2, 2022. The Work shall be Substantially Complete on or before September 16, 2022 with fi nal completion on or before September 30, 2022.

Bid Results

Educational

$2,958,804.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
40
Bidding Soon
640
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

June 2, 2022

img_map_placeholder

615 E Orange St, Hoopeston, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.