Renovation of a mixed-use development in Creighton, Missouri. Completed plans call for the renovation of a educational facility.
As of May 5, 2022, project has been award to Wilson Group but no amount available. Proposal Security: Each proposal shall be accompanied by a certified or cashier s check or proposal bond acceptable to the Owner in an amount at least equal to five percent (5%) of the total amount of the proposal and payable without conditions to the Owner. The proposal security which must accompany each proposal is required as a guarantee that the Contractor will enter into contract with the Owner for the work described in the proposal and furnish performance bond as specified. Liquidated Damages: Liquidated damage will be assessed to the Contractor for damages which the Owner will suffer by reason of the fact that the Contractor does not complete work which such Contractor is required to perform within the time specified and in the contract, by reason of increased cost of inspection, loss to the Owner by not having use of the building or any other expense incurred by the failure to complete the job within the time specified. The Contractor agrees that to the extent possible, the Owner may deduct from the amount otherwise due the Contractor $1,000 per day, for each calendar days of delay in completion of the work on each scheduled completion date as stated above and agrees that to the extent it is not possible to make such deductions from the amount otherwise due the Contractor, the Contractor will pay the Owner $1,000 for each calendar day the work remains incomplete, and it is agreed that such deductions or payments will be taken as liquidated damages and not as a penalty. Performance and Payment Bonds: The successful proposals of the work will be required to furnish performance and payment bonds in an amount equal to one hundred percent (100%) of the contract price, giving as security an approved surety bond company bond, which shall meet a Class A rating by the BEST S INSURANCE RATING GUIDE. The performance bond shall cover both labor and materials. The work includes removal of old windows including glass, frames, and other items and the installation of new window frames, glass, and other items. Main High School Hallway This would be for replacement of all windows originally installed during the1960s. There are 2001 additions that will not require replacement. 3 Single Office windows 12 Original classroom sets of windows 2 Cafeteria windows 3 Special Education Office windows Middle School Hallway This would be for replacement of all windows originally installed during the 1960s and 1970s. There are additions from 1997 and 2001 that will not require replacement. 16 window sets Additional Possible Scope of Work Proposed pricing should the District desire to replace all windows from all eras in the hallways. In addition to the work above an estimated OPTIONAL cost to also replace. Please have a line-item cost for the District to add each of the following: 6 sets of HS library windows 13 windows in area of added classrooms on the HS wing 29 windows in area of added classrooms on the MS wing 4 windows in hallway by Central OfficeMain High School Hallway This would be for replacement of all windows originally installed during the1960s. There are 2001 additions that will not require replacement. 3 Single Office windows 12 Original classroom sets of windows 2 Cafeteria windows 3 Special Education Office windows Middle School Hallway This would be for replacement of all windows originally installed during the 1960s and 1970s. There are additions from 1997 and 2001 that will not require replacement. 16 window sets Additional Possible Scope of Work Proposed pricing should the District desire to replace all windows from all eras in the hallways. In addition to the work above an estimated OPTIONAL cost to also replace. Please have a line-item cost for the District to add each of the following: 6 sets of HS library windows 13 windows in area of added classrooms on the HS wing 29 windows in area of added classrooms on the MS wing 4 windows in hallway by Central Office The Contractor agrees that to the extent possible, the Owner may deduct from the amount otherwise due the Contractor $1,000 per day,
Award
Educational
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2022
May 16, 2022
Multiple Locations, Creighton, MO
Related To This Project
Creighton, MO
Bid Date: Sep 06 2022
Creighton, MO
Bid Date: May 03 2023
Creighton, MO
Bid Date: May 03 2023
Creighton, MO
Bid Date: Sep 06 2022
Creighton, MO
--
Creighton, MO
Bid Date: Oct 01 2024
Creighton, MO
Bid Date: Apr 15 2022
Creighton, MO
Bid Date: Dec 09 2022
Creighton, MO
--
Creighton, MO
Bid Date: Nov 11 2022
Creighton, MO
Bid Date: Apr 15 2022
Clayton, MO
--
Saint Louis, MO
Bid Date: Apr 21 2022
Clayton, MO
Bid Date: Apr 14 2022
Lees Summit, MO
Bid Date: Mar 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.