Site work for a playground / park / athletic field in Creighton, Missouri. Completed plans call for site work for a 9,000-square-foot playground / park / athletic field.

Enquiries can be sent via email to Chris Ball (cball@jbapc.com) and/or (Joey Crum) (jcrum@jbapc.com). Hourly wages, as set forth by the Department of Labor and Industrial Relations and the prevailing wage law, will be complied with on this project. Performance Bond and Material and Labor Payment Bond in amount of 100% of contract price shall be furnished by successful bidder. The Board reserves the right to accept or reject any or all bids and waives any informality in the bidding. The bidder acknowledges the right of the Owner to reject any or all bids and to waive any informality or irregularity in any bid received. In addition, the bidder recognizes the right of the Owner to reject a bid if the bidder failed to furnish any bid security, or to submit the data required by the bidding documents, or if the bid is in any way incomplete or irregular. Construction Schedule: Construction Schedule may start immediately and must be substantially complete by August 15, 2025. If the Contractor refuses, neglects, or fails to complete the Work within the time stated in the Contract, then the Contractor and the Contractor's surety, if any, shall be liable for and shall pay the Owner, not as penalty but as liquidated damages, the sum of four hundred dollars ($400.00) for each calendar day that the Contractor is in default after the time stipulated in the Contract for completing the Work of each Phase until the Work is Substantially Complete. The Owner may withhold from payments due the Contractor, such amounts as may be assessed as liquidated damages. Upon Substantial and Final Completion of the Work, the Owner may adjust the Contract Sum by the amount of the assessed liquidated damages Furnish and install all Wrestling Mats, Wall Pads, Indoor Tennis Net, Retractable Batting Cages, Sunshade, Portable Soccer Goal, Free Standing Bleachers, and Field Layout & Plugs as shown on the drawings and specified herein. Bid Results :: Contractor :: Westport Construction $1,659,800 Hardware Contractor :: Ron Miller Hardware $21,450

Award

Playgrounds / Parks / Athletic Fields

$1,681,250.00

Public - City

Site Work

39

20

2

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
23
Bidding Soon
616
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

November 30, 2024

img_map_placeholder

33300 Sherwood Dr, Creighton, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.