Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Keene, New Hampshire. Contact the soliciting agency for additional information.
Southwest Region Planning Commission (SWRPC) has prepared this Request for Qualifications (RFQ) to solicit submittals from individuals/consulting firms to perform technical assistance visits to selected project sites and generate detailed conceptual design plans, calculations and projected costs as described in the Scope of Work. The current Ashuelot River Corridor Plan was last updated in 2006. Since that time, the effects of climate change have impacted the watershed with more frequent storm events of greater magnitude causing erosion and flooding in various reaches of the river. This project will provide an update to that plan. It will include an updated assessment of the condition of the land and uses in the river corridor with a focus on climate change, storm water run-off and water quality. To help meet the data collection needs, a survey tool was developed and used to assess the river corridor which will help to identify areas to include in the action plan. The updated river corridor Plan will identify those areas that should be given consideration for remediation and implementation. The Plan will also assist by providing the basis for seeking implementation funding through multiple sources such as FEMA s Hazard Mitigation Planning Grant program, NHDES Watershed Assistance grants (EPA 319), Clean Water State Revolving Fund, NH Conservation License Plate Grant program, and others. The selected consultant will complete tasks to assist SWRPC in the update of the Ashuelot River Corridor Plan. The tasks to be completed by the consultant represent a small portion of the overall project. The consultant will work collaboratively with SWRPC by providing technical services to complete tasks, or portions of tasks associated with this project. Following is a generalized description of the tasks that are to be completed by the consultant. 1. Participate in a meeting(s) involving work group members and project partners to identify 5 - 10 priority areas for potential implementation projects. 2. Develop options, including cost estimates, for ways to lessen erosion into the Ashuelot River at the meandering S-curves near the campground road in Swanzey. 3. Serve as a resource to SWRPC in providing content for inclusion in the draft of the Ashuelot River Corridor Management Plan Update regarding potential project sites. Qualifications packages should include a generalized schedule for conducting and completing the activities described in the Scope of Work. It is expected that work on this project will be completed by September 2022. Neither SWRPC nor NHDES will respond to telephone questions about this RFQ. Any questions about this RFQ raised by an individual/firm will be answered in a summary digest. The summary digest will be provided to those who contact SWRPC and request to be put on an e-mail list to receive the digest. The cut-off date for questions and requests to be put on the e-mail list to receive the summary digest is February 28, 2022. E-mail Lisa Murphy of SWRPC at lmurphy@swrpc.org to ask a question or to be put on the e-mail list to receive the summary digest. The summary digest will be provided via e-mail on March 4, 2022 to all applicants on the response list. The Method of Contractor Selection has not been determined at this time.
Conceptual
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2022
Multiple Locations, Keene, NH
Related To This Project
Keene, NH
Bid Date: Mar 01 2022
Keene, NH
Bid Date: Mar 01 2022
Keene, NH
Bid Date: Mar 17 2022
Keene, NH
--
Keene, NH
Bid Date: Apr 01 2022
Keene, NH
Bid Date: Mar 24 2022
Keene, NH
--
Keene, NH
Bid Date: Mar 04 2022
Keene, NH
Bid Date: Feb 24 2022
Keene, NH
Bid Date: Feb 10 2022
Keene, NH
Bid Date: Mar 31 2021
Keene, NH
Bid Date: Apr 01 2021
Keene, NH
Bid Date: Feb 16 2022
Keene, NH
Bid Date: Jun 12 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.