Site work and renovation of a civil project in Bedford, Pennsylvania. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
**As of April 21, 2022, one bid was received and it was rejected. No definite date for the rebid.** This project consists of the replacement of a portion of the Municipal Authority of the Borough of Bedford Wastewater Treatment Plant's bulk chemical storage tank and chemical feed system. Major work involves the installation of a new 2,050-gal. chemical storage tank, new chemical feed pumps, valving, and controls, and all site work necessary to complete the work. A certified check or bank draft, payable to the order of Municipal Authority of the Borough of Bedford or negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond on the form provided, executed by the Bidder and an acceptable surety (Surety companies must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania), in an amount equal to ten percent (10%) of the total of the Bid shall be submitted with each bid to guarantee the Bidder's entrance into a contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements set forth in the plans, specifications or any applicable statutes of the Commonwealth of Pennsylvania, or any applicable municipal ordinances. The successful bidder will be required to furnish and pay for satisfactory Performance and Payments Bonds, on the forms provided, each in the amount of one hundred percent (100%) of the Contract Price with a surety company listed on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania. Pennsylvania Prevailing wage rates will apply to this contract. The contract documents contain requirements addressing prevailing labor wage rates. The Owner shall award the contract to the lowest responsible bidder or shall reject all bids within 60 days of the date of the bid opening, and no bidder may withdraw his bid before the expiration of such 60-day period; PROVIDED, however, that if the award of the contract is delayed by a required approval of another government agency, the sale of bonds or the award of the grant or grants, the Owner shall reject all bids or award the contract to the lowest responsible bidder within 120 days of the date of the BID opening, and no bidder may withdraw his bid before the expiration of such 120-day period. Thirty (30) day extensions of the date for the award of the contract may be made by the mutual written consent of the Owner and the lowest responsible bidder. Bidders for this contract shall have completed projects similar in character and scope and will be required to provide with their Bid a Qualifications Statement for prime contractor and all subcontractors. Addenda, if any, will be issued to only those persons whose names and address are on record with Stiffler Associates, Inc. as having obtained the Contract Documents. Contract Times are 180 calendar days for Substantial Completion and 210 calendar days for Final Completion. The Municipal Authority of the Borough of Bedford reserves the right to reject any or all bids or to waive any informalities in the bidding.
Final Planning
Water / Sewer
$285,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 10 - Specialties
Division 11 - Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2022
October 21, 2022
To Be Determined, Bedford, PA
Related To This Project
Bedford, PA
Bid Date: Apr 18 2022
Bedford, PA
Bid Date: Jun 21 2022
Bedford, PA
Bid Date: Aug 31 2022
Bedford, PA
Bid Date: Jan 25 2023
Bedford, PA
Bid Date: Jan 25 2023
Bedford, PA
Bid Date: Mar 30 2023
Bedford, PA
Bid Date: Mar 10 2023
Bedford, PA
Bid Date: Mar 21 2023
Bedford, PA
--
Bedford, PA
Bid Date: Dec 14 2023
Bedford, PA
Bid Date: Oct 04 2022
Lewisburg, PA
Bid Date: Mar 24 2022
Philadelphia, PA
Bid Date: Dec 03 2021
McMurray, PA
Bid Date: Mar 17 2022
Kittanning, PA
Bid Date: Apr 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Wastewater Treatment Plant Bulk Chemical Storage Tank Project
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.