BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Buckley, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The pavement will be rehabilitated from the south side curb to 6 inches beyond the northerly fog line on approximately 0.95 miles of roadway on 112th Street East from the east side of Mundy Loss Road to the west approach of SR 165, recently constructed by another TIB project. The Work shall be substantially complete within 25 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Buckley, Washington. For assistance, please call (206) 284-0860. Contract questions shall be directed only to the office of the Project Engineer. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Buckley" and in an amount of not less than five percent (5%) of the total Proposal amount. As required by the Contract, a postal money order, certified check, cashier's check or Proposal bond made payable to the Owner is attached hereto. If this Proposal is accepted and the undersigned fail(s) or refuse(s) to enter into a contract and furnish the required performance bond, labor and material payment bond, special guarantee bonds (if required), required insurance and all other required documentation, the undersigned will forfeit to the Owner an amount equal to five percent of the Proposal amount. The undersigned has reviewed and fully understands the provisions in the Contract regarding liquidated damages and agrees that liquidated damages shall be $1,500.00 per day for each and every working day beyond the Contract Time allowed for substantial completion until the Substantial Completion Date is achieved and $500.00 for each and every working day required beyond the Contract Time for physical completion until the Physical Completion Date is achieved. Financing of the Project has been provided by City of Buckley, Washington and the Transportation Improvement Board. The City of Buckley expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. The undersigned agrees that the Owner reserves the right to reject any or all Proposals and to waive any minor irregularities and informalities in any Proposal.

Bid Results

Roads / Highways

$533,494.00

Public - City

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
66
Bidding Soon
1,509
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

April 25, 2022

Project location map

112th St E, Buckley, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.