Renovation of an educational facility in Clair, New Brunswick. Completed plans call for the renovation of a educational facility.

The work under this Contract includes, but is not limited to the following: .1 Expand existing Delta DDC System with new DDC Points as outlined. .2 Contractor to supply and install new circulation pumps as outlined. Provide new electrical feeds for pumps and provide piping modifications as outlined. All new piping to be insulated. .3 Contractor to carry all costs to have NB Power install new dual-channel pulse relay on NB Power Meter. .4 Provide all programming and necessary components for 'Sequence of Operation' modifications. .5 Provide enhanced control strategies including: morning warm-up strategy to offset demand, occupied mode, NSB mode, low occupancy mode, calendar schedule, summer mode. .6 Provide MSTP network wiring between Global Controller(s) and new VFD's. Provide minimum 3 pair cable stranded twisted pair (FT4 rating in conduit; FT6 rating otherwise). .7 Provide appropriate end-of-line resistors to all device communication drop legs. .8 Provide all new points/sensors devices as outlined. Commissioning is required for all new points. .9 Provide all required modifications to electrical systems (i.e. including relays, contactors, transformers, switches, etc.) to make all control systems a complete operational package. .10 All power wiring to be in conduit. .11 All wiring in mechanical, electrical and service rooms or where it may be subject to damage shall be installed in conduit. .12 FT6 plenum rated cabling will be permitted in all ceiling spaces providing it is run parallel along a surface or perpendicular to it and neatly tied at 2m intervals. Where FT6 plenum cables are used without raceway or conduit, it shall be supported from or anchored to structural members. .13 Cables shall not be supported by or anchored to ductwork, electrical raceway, piping or ceiling suspension systems. All other wiring to be in conduit. .14 All wire drops in occupied spaces shall be concealed in walls. Where access is impossible, surface drops will be enclosed in wire mold raceway. Color/paint to match existing wall. Documents are available through the Construction Association of NB.

Award

Educational

$70,650.00

Public - State/Provincial

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
2
Bidding Soon
74
All Active Projects
31
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

April 23, 2022

img_map_placeholder

323 Bd Long, Clair, NB

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.