Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a library in Ashland, Oregon. Completed plans call for the renovation of a library.
As of April 25, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The objective of this project is to replace aged HVAC equipment at the Ashland branch Library. The Ashland library constructed 1912 and remodeled and expanded in 2001 and is located near down-town Ashland. The building relies on a water source heat pump system utilizing 2 boilers and one cooling tower. There are a total of 13 heat pumps located throughout the facility's 3 levels.Contractor is responsible for removal and disposal of all equipment to be replaced in accordance with applicable codes, laws and requirements standard to the industry. Equipment specified for removal is in bid documents, agreed upon based on pre-bid walkthrough, through addenda or that will be necessary for installation of new equipment not specifically called out (i.e. ducts, conduits, etc.). See bid documents for further information. Bid security in the amount of ten percent (10%) of the amount bid, and in the form prescribed in the Instruction to Bidders, must accompany each bid. Bid security of the unsuccessful bidders will be returned or refunded as and when provided in the Instructions to Bidders. Contractor to provide all required labor, subcontracted labor, new water source heat pumps, boilers, duct transitions, misc. equipment/hardware, piping, electrical items, cooling tower and concrete pad and necessary site work, building modifications, required permits, and low voltage controls and DDC system programming per documents to provide a turn-key equipment upgrade to the Ashland branch library. Contractor to have dedicated Superintendent on site when work is being performed. See bid documents from Arc Sine for further specifications and details. Bidder to include an approximate timeline for project in bid package. Winning bidder to work with the Jackson County Library District and Jackson County Facility Maintenance to develop a project timeline based on equipment lead times, available labor, and possible necessary building closures.
Award
Library
$799,800.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2022
May 9, 2022
410 Siskiyou Blvd, Ashland, OR
Related To This Project
Ashland, OR
Bid Date: Jun 09 2022
Ashland, OR
Bid Date: Dec 15 2022
Ashland, OR
Bid Date: Jan 18 2023
Ashland, OR
--
Ashland, OR
Bid Date: May 13 2020
Ashland, OR
Bid Date: Apr 26 2022
Ashland, OR
Bid Date: Mar 29 2022
Ashland, OR
Bid Date: Mar 08 2022
Ashland, OR
Bid Date: May 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
