BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Greenville, North Carolina. Completed plans call for site work for a bridge / tunnel.

The work includes all labor, equipment, and materials to complete in every detail of the work indicated on the plans and specifications. Specifically, all work incidental thereto Wildwood Park Bridges & Boardwalks as part of the Wildwood Park Observation Tower and Trails Project including, but not limited to, demolition, earthwork, drainage, bridges & boardwalks construction, paving, and stabilization. The goal for Minority and / or Women Business Enterprise (M/WBE) participation is MBE 10% and WBE 6%. Each goal must be met separately. Exceeding one goal does not satisfy requirements for the other. If applicable, each proposal shall be accompanied by a bid bond executed by a corporate security licensed to do so under North Carolina law, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof, a bidder may offer a certified check from a financial institution insured by the Federal Deposit Insurance Corporation (FDIC) as a deposit. Questions about this bid should be directed to Mark Nottingham, Parks Planner at 252.329.4242 or via email: mnottingham@greenvillenc.gov. To whom the contract is awarded, a Performance and Payment Bond will be required for one hundred percent (100%) of the contract price. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days after the bid date. The City Council of the City of Greenville reserves the right to reject any or all proposals. The liquidated damages for this contract are One Thousand Dollars ($1000.00) per calendar day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$263,600.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
42
Bidding Soon
730
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

September 2, 2024

img_map_placeholder

3450 Blue Heron Dr, Greenville, NC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.