BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Arlington, Washington. Completed plans call for site work for a water / sewer project.

Wet Well Lid Improvement - A new concrete wet well lid will be constructed on top of the LS-06 existing concrete lid, the new lid will include a City provided stainless steel access hatch to be integrally cast in with the new lid by the contractor. A summary of work includes, but is not limited to: - Installation, maintenance or erosion control silt fence and soil stabilization products (polyethylene sheeting, erosion control blankets, jute matt, etc.). - Excavation to expose existing wet well concrete lid, clean and prep of existing lid for new lid construction. - Cutting of new access hatch penetration into the existing wet well concrete lid to match penetration to be formed in new concrete lid. - Construct formwork and structural steel placement for new lid - Pour, place and treat concrete for new wet well lid - Installation of City provided access hatch per manufacturer's directions, hatch framework to be cast integral with concrete lid. - All work to be completed per plans and specifications included with this bid package and other referenced specifications. Area Clean-up & Restoration - After the proposed work is complete and accepted by the City, CONTRACTOR shall remove all construction erosion measures and ground shall be restored and stabilized to the original condition; disturbed ground shall be reseeded. CONTRACTOR will perform a final site walk through with City Project Manager ensuring that all debris has been removed, that all work items have been completed, and that the site has been returned to normal function and operation. Estimated Project Value: $15,000 - $20,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions pertaining to this bid or the mandatory pre-bid site walk that require a response must be received by Thursday, March 17, 2022 at 2:00 pm, questions received after this date/time may not be responded to.

Bid Results

Water / Sewer

$44,500.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
146
Bidding Soon
3,040
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

April 21, 2022

Project location map

19210 Smokey Point Blvd, Arlington, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.