BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Arlington, Washington. Completed plans call for site work for a water / sewer project.

Wet Well Lid Improvement - A new concrete wet well lid will be constructed on top of the LS-06 existing concrete lid, the new lid will include a City provided stainless steel access hatch to be integrally cast in with the new lid by the contractor. A summary of work includes, but is not limited to: - Installation, maintenance or erosion control silt fence and soil stabilization products (polyethylene sheeting, erosion control blankets, jute matt, etc.). - Excavation to expose existing wet well concrete lid, clean and prep of existing lid for new lid construction. - Cutting of new access hatch penetration into the existing wet well concrete lid to match penetration to be formed in new concrete lid. - Construct formwork and structural steel placement for new lid - Pour, place and treat concrete for new wet well lid - Installation of City provided access hatch per manufacturer's directions, hatch framework to be cast integral with concrete lid. - All work to be completed per plans and specifications included with this bid package and other referenced specifications. Area Clean-up & Restoration - After the proposed work is complete and accepted by the City, CONTRACTOR shall remove all construction erosion measures and ground shall be restored and stabilized to the original condition; disturbed ground shall be reseeded. CONTRACTOR will perform a final site walk through with City Project Manager ensuring that all debris has been removed, that all work items have been completed, and that the site has been returned to normal function and operation. Estimated Project Value: $15,000 - $20,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions pertaining to this bid or the mandatory pre-bid site walk that require a response must be received by Thursday, March 17, 2022 at 2:00 pm, questions received after this date/time may not be responded to.

Bid Results

Water / Sewer

$44,500.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
46
Bidding Soon
1,747
All Active Projects
583
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

April 21, 2022

img_map_placeholder

19210 Smokey Point Blvd, Arlington, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.