Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 27, 2025 at 7:00 PM
Updated February 28, 2025
Site work, paving and renovation of a mixed-use development in Longmont, Colorado. Conceptual plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Update:https://longmontcolorado.gov/wp-content/uploads/2025/02/2025-29-Adopted-CIP-v5.pdf This project provides development of the 263 acre lake and surrounding property for recreational use per the adopted Master Plan. Full facility improvements include a shelter, benches, interpretive signage, trail connections and a trailhead parking lot. Phases 1, 2 & 3 are complete. Construction of Phases 4 and 5 will be now be combined as of 2022. Originally however, Phase 4 was designed to include a trail connection from 17th Ave. to the primary greenway north of Lake McIntosh Farms, a path in Dawson Park to 17th along Lakeshore, and a shelter near the lake; Phase 5 provides a new trailhead at 17th. (This project doesn't include funding for a pedestrian crossing or underpass at 17th Ave., but this will be also be needed in this project when SVG Phase 12, i.e., the N/S trail connection from the St. Vrain Greenway, is made (DSC). Project is included in City of Longmont Fiscal Year 2025-2029 Page no 122 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project provides development of the 263 acre lake and surrounding property for recreational use per the adopted Master Plan. Full facility improvements include a shelter, benches, interpretive signage, trail connections and a trailhead parking lot. Phases 1, 2 & 3 are complete. Construction of Phases 4 and 5 will be now be combined as of 2022. Originally however, Phase 4 was designed to include a trail connection from 17th Ave. to the primary greenway north of Lake McIntosh Farms, a path in Dawson Park to 17th along Lakeshore, and a shelter near the lake; Phase 5 provides a new trailhead at 17th. (This project doesn't include funding for a pedestrian crossing or underpass at 17th Ave., but this will be also be needed in this project when SVG Phase 12, i.e., the N/S trail connection from the St. Vrain Greenway, is made (DSC). As of December 3, 2024, this project is included in the City of Longmont's Fiscal Year 2024-2028 CIP. Further information regarding a design firm and timeline for construction has not yet been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$1,995,300.00
Public - City
Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
