BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Elizabeth City, North Carolina. Completed plans call for the construction of a 33,500-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

his project includes 9 acres of site development with modification to existing drainage ditches to prepare the site for a soccer field, future tennis courts, sidewalks, and parking supporting the new shop facility. A storm water retention pond is anticipated. The two new buildings include a 12,000 SF Shop Facility and 21,500 SF Gymnasium. The shop facility is to be a pre-manufactured metal building and includes an entry canopy and vestibule with interior access to restrooms and 3 large shop classrooms with overhead doors and supporting offices. The gymnasium facility is also designed to be a metal building. The selected CM will be engaged to provide guidance on the most appropriate construction type given current market conditions and the requirements of the school. The building space program includes a covered entry and vestibule adjacent to the large lobby with support spaces including restrooms, tickets, and concessions. The gymnasium will house a competition gym with 500-1,000 movable bleachers. Back of house spaces include locker rooms, ref lockers, storage, and coaches' office. Future development includes a covered walkway to connect the gymnasium building to the shop facility and a covered walkway to connect back to the existing school. Additionally, the existing school will undergo an exterior update to provide a new feature canopy and solar panel system at the main entry. The CM will need to provide guidance on cost of these items to determine their feasibility within the project scope. Estimated construction budget is ($9,000.000). One Hundred Percent (100%) Performance & Payment Bonds will be required. Questionnaire for Construction Manager at Risk can be obtained from: Project Manager: Matt Bramstedt, AIA

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$9,000,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
19
Bidding Soon
406
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

July 25, 2022

img_map_placeholder

1413 W Ehringhaus St, Elizabeth City, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.