Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 2, 2022 at 8:00 PM
Updated September 14, 2023
Site work and renovation of a medical facility in Edmonton, Alberta. Completed plans call for the renovation of a medical facility; and for site work for a medical facility.
The Gunn site will be developed in two phases. .1 Phase 1-The construction of a 50-bed, male-only Recovery Community at the existing McCullough Centre. .1 Hazard Abatement of the Houses marked for renovation in this phase. .2 Demolition of the existing Dining Hall. .3 Renovations of the existing Recreation Hall and development of the parking lot to the South. The Hall will be selectively renovated to provide facilities for the residents. It will consist of a Reception area, Board room, Executive Director's office, Office area, Breakout room, Shower/washroom, Hot room, Laundry area, general Common Intake area, storage rooms, 24-hour Resident Support Office, Two (2) Resident Lounge areas, Therapy office/rooms, a general store and shop area, and a Fitness room. .4 Houses to the East - 8 existing 6-bedroom houses on the East portion of the site, and one 6-bedroom house to the North of the new dining hall to accommodate 50 residents with single occupancy bedrooms, common living space and shared washroom facility. .5 Medical Clinic - 1 existing 6-bedroom house, North of the existing Dining Hall, will be renovated to contain Medical Offices, exam rooms and medication storage and dispensing areas. .6 New Dining Hall - to accommodate 100 males, constructed on site with modern code-compliant commercial kitchen, a secure commercial laundry with high-capacity commercial washer and dryer, a gender neutral staff washroom, code-compliant washroom facilities for 100 men, site infrastructure (electrical/mechanical) accommodation. .2 Phase 2 - The further Hazmat abatement and development and renovation of the remaining houses on the West side of the property (approximately 50 beds) depending on determination of accessible units required one or more of these will be identified for conversion to accommodate barrier free sleeping and washrooms.
Award
Medical
$2,960,059.00
Public - State/Provincial
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2022
May 2, 2022
about 77 kilometers West of Edmonton just east of the Hamlet of Gunn, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Mar 19 2024
Edmonton, AB
--
Edmonton, AB
Bid Date: Aug 03 2022
Edmonton, AB
--
Edmonton, AB
Bid Date: Aug 04 2022
Edmonton, AB
Bid Date: Aug 04 2022
Edmonton, AB
Bid Date: Aug 04 2022
Edmonton, AB
Bid Date: Aug 10 2023
Edmonton, AB
Bid Date: Jul 29 2022
Edmonton, AB
--
Edmonton, AB
Bid Date: Sep 14 2023
Edmonton, AB
Bid Date: Jul 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
