Published April 25, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Fairbanks, Alaska. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 25, 2022, project was awarded to HC Contractors,Inc ,awarded amount is $20,953,152.40.** Replace the deck of the Chena River Bridge #0231 and resurface the Steese Expressway. In addition to bridge work, there will be pavement preservation, roadside hardware, ADA and drainage improvements. Engineer's Estimate is between $20,000,000 and $30,000,000. The project completion date is October 21, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$20,953,152.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
1
Bidding Soon
45
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

May 30, 2022

Project location map

Multiple Locations, Fairbanks, AK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.