BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Boynton Beach, Florida. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

The City of Boynton Beach is seeking the services of a qualified Contractor to construct a full-depth two-lane roadway reconstruction and re-grading; over 750 linear feet of 24-inch and 18-inch polypropylene drainage pipe inclusive of eleven drainage structures, perforated pipe, and 6-foot-wide exfiltration trench; new curbing and swale re-grading throughout the project area; and incidental construction of sidewalk, driveways, sod, pavement markings, signage, water main deflections, and sewer lateral reconstruction.

Award

Water / Sewer

$1,007,061.00

Public - City

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
142
Bidding Soon
1,902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

May 6, 2022

Project location map

Industrial Way, Boynton Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.