BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in Boynton Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Boynton Beach is seeking the services of a maximum of two (2) qualified Contractors to provide road resurfacings, general road construction, asphalt pavement, roadway repair, guardrail work, sidewalks, sodding, roadway striping, earthwork construction, and other incidental work associated with asphalt and sidewalk rehabilitation, on an as-needed basis per specifications. Question Deadline: Mon Jan 31, 2022 2:00:00 PM (EST)

Award

Roads / Highways

$118,603.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
142
Bidding Soon
1,902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

February 25, 2022

Project location map

Multiple Locations, Boynton Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.