BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Swift Current, Saskatchewan. Completed plans call for site work for a water / sewer project.

The City of Swift Current (the "City") is inviting contractors to submit proposals for the installation of new Storm and Water main infrastructure in the vicinity of the Herbert Street and 5th Avenue NE intersection. The option to award the full or partial contract is at the City's sole discretion. The Contractor is required to perform the services listed below and all related work as required in the 2022 Herbert Street Water/Storm Realignment project. The work generally comprises of: - Supply and Installation of Approximately 13m of 1050mm PVC Storm Sewer main complete with connections to new and existing manholes; - Supply and Installation of New Storm water manhole complete with connection to existing 900mm Wood Stave storm sewer; - Supply and Installation of Approximately 45 metres of 400mm HDPE DR9 water main (via trenchless methods) complete with connections to existing AC water main, installation of all related piping fittings appurtenances and connections; - Quality Control Materials Testing - Site civil works, including landscaping and overall site restoration; - Restoration of all disturbed surfaces; - Traffic Accommodation; - Repair of defects for one year after completion of work, or such longer periods as specified in the Contract Documents; - Work is inclusive of all site works, surface works and underground utility construction as per Contract Documents. bid value not released for publication.

Award

Water / Sewer

$200,000.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
20
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2022

July 4, 2022

Project location map

Herbert St E, Swift Current, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.