BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work, paving and outdoor lighting for a civil project in Miami, Florida. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.

As of December 4, 2025, this project is in the conceptual phase. The design consultant may be selected between October 2026 and April 2027. The design phase is scheduled to start in fiscal year 2027 (between July 2026 and June 2027). The owner is working on developing a design schedule. The Construction Phase is scheduled for FY30 but no specific month has been defined yet. Project number is 455886-1-52-01 *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Oral Presentation Professional Liability Insurance :$500,000.00 TRC Members (Subject to Change) : BaoYing Wang Nicholas Danu Pablo Orozco Financial Management Number(s) 44820612201 The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Advertisement Tentative Dates Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Scope of Services Meeting Date: Wednesday, April 20, 2022 Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: Wednesday, May 4, 2022 Tentative Oral Presentation Date: Thursday, May 5, 2022 Longlist Date/Time 4/12/2022 06:30 pm Shortlist Selection Date/Time 4/18/2022 07:30 pm Scope Meeting Date/Time 4/20/2022 06:30 pm Phase II Submittal Deadline Date/Time 5/11/2022 12:30 am Oral Presentation Date/Time 5/12/2022 Final Selection Date/Time 5/31/2022 07:30 pm Negotiations Period Begin Date 6/08/2022 Negotiations Period Ending Date 7/30/2022 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR 5/US-1 Long Key Bridge Over Long Key Channel

Conceptual

Roads / Highways

$214,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
107
Bidding Soon
1,732
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2030

Project location map

Multiple Locations, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.