BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2022 at 8:00 PM

Updated September 4, 2025

Site work for a water / sewer project in Miami, Florida. Completed plans call for site work for a water / sewer project.

The Work consists of furnishing all materials, labor, tools, and equipment required for the construction of approximately 4.9 miles of new curtain wall (vertical subsurface barrier) along the L-357W Levee. The overall project consists of the design of a seepage barrier along the Levee 31N (L-31N) in Miami-Dade County. The project intendsto controlseepage from Everglades National Park and provide the appropriate amount of groundwater flow to minimize potential impacts to the West Well Field and Biscayne Bay. To meet these needs, a levee curtain wall (vertical subsurface barrier) has been proposed along L-31N in Miami-Dade County to reduce seepage flow from ENP.

Award

Water / Sewer

$42,258,301.00

Public - State/Provincial

Site Work

95

13

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
107
Bidding Soon
1,732
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

August 23, 2022

Project location map

To Be Determined, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.