Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, asbestos abatement and renovation of a mixed-use development in Miami, Florida. Working plans call for the renovation of a pre-engineered storage facility; for asbestos abatement for a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
Bid Cancelled. The needs of the government have changed Solicitation 36C24822R0122 is hereby cancelled. Construction Completion by: 360 calendar days after NTP. I. Provide: 1. Professional construction services to include but not limited to: A. Construct, furnish and install all items as per this SOW and the supplied 100% design documents and specifications to Renovate Sterile Clean Storage Rooms. II. Applicable Codes and Standards: 2. The following laws, regulations, policies, and procedures in effect on date of contract issuance and all subsequent changes or updates apply: A. VA Design Guide http://www.cfm.va.gov/til/ B. International Plumbing Code C. Florida Plumbing Code D. International Mechanical Code - 2012 Edition E. International Energy Efficiency Code - 2012 Edition F. Service Contract Act (SCA) www.SAM.gov G. Federal Acquisition Regulation H. Veterans Administration Acquisition Regulation I. VA Directive 0058- VA Green Purchasing Program J. VA Directive 0057- VA Environmental Management Program K. Master Construction Specification: https://www.cfm.va.gov/til/ncaSpec.asp L. American National Standards Institute (ANSI) M. Provisions of Construction and Safety Signs stated in the General Requirements Section of the Specifications III. Acronyms: 3. Glossary: Acronyms used in this SOW are listed below for easy reference: A. CO Contracting Officer B. COR Contracting Officer's Representative C. FAR Federal Acquisition Regulation D. CFM Construction & Facilities Management E. VA Veteran Affairs F. EPA Environmental Protection Agency G. PPE Personal Protective Equipment H. SOW Statement of Work I. OSHA Occupational Safety and Health Administration J. NTP Notice to Proceed K. MVAMC Miami Veterans Affairs Medical Center IV. GENERAL: This project scope is to renovate existing and construct new Sterile Clean Storage Rooms (SCSR) according to the new Veterans Health Administration (VHA) standards. This shall include all architectural items affected such as wall, tiles, paint, door, frame, and flooring. Also, shall include all electrical, mechanical, and plumbing needs such as source determination and connections. This project shall address any asbestos remediation under the existing floor or on any duct work that may be exposed during the construction as well as revision and upgrade of the electrical and Heating Ventilation Air Conditioning (HVAC) systems serving the area to meet all codes, standards, and The Joint Commission regulations. Provide the necessary equipment, infrastructure, and renovations need to bring the SCSR closets in compliance with humidity and temperature requirements. 4. Miami VAMC intends to issue a construction contract. The work will include but not limited to: A. Construction Services: The Contractor shall provide all labor, transportation, materials, equipment, and supervision required to Renovate Sterile Clean Storage Rooms. B. Construction activities as per the provided 100% construction documents and specifications. See Summary below. The rooms are as follows: A711, A712, B724, D708, B317a, B337c, B1208, B1214, C307, C309, C803 2A152, 2A157c, 1B117 Renovate room currently not in use for Reusable Medical Equipment (RME) to be compliant for RME storage: 1B147 B616 (this may include work to convert A605 for housekeeping storage, and work to convert B637 for use as a soiled utility room) Major Project Areas: a. Installing new hydronic piping ( 3/4 "Heating Hot water Supply and Return and 3/4 " Chilled Water Supply and Return lines). Tie into existing infrastructure loop system. b. Installing 13 new fan coil units(one for each proposed room). c. Installing 13 supply thermal cooling units(one for each proposed room). d. Install new ducting to support new unit installs(new supply ducts). e. Removing existing flooring (required potential asbestos abatement). f. Removing some drop ceiling constructed rooms and rebuilding ceiling with hard surface. g. Painting (anti-microbial Paint) and patching (may require plastering) required in each room. h. Installation of adequate countertops and sinks. i. Potential re-configuring of redesigned sprinkler system in rooms with new hard ceilings. j. Install new sensor in rooms and run back to Siemens Energy Management System in Graphic Control Room. Temp, Pressure and Humidity sensors in each room. PC (ATU controller), FE (Air Flow Controller), TE (Discharge Temp Sensor), and (Thermostat). New controls will have to communicate with Graphic Controls Center. k. Contractor shall commission each system room. New electrical will need to be run to each new unit. Electrical runs will be to closest electrical room. Scope also includes the following items: l. Asbestos remediation/removal under the existing floor or any duct work areas. m. Upgrade of electrical to meet new supply unit configurations. n. Upgrading of HVAC Systems to provide acceptable positive pressure in each room. o. Replacement of flooring to new vinyl composite tiles. p. Replacement of existing ceiling tiles rooms to hard ceiling. q. Painting (anti-microbial Paint) and patching. r. Installation of adequate countertops and sinks. s. Installation of adequate lighting fixtures and outlets as needed. t. Contractor to perform pretest and balancing of all involved diffusers, grilles, Variable Air Volume (VAV) boxes and mixed boxes, prior to construction. Any existing VAV boxes or mixed boxes that are to remain must be rebalanced and tested. u. Contractor shall seal all openings for ductwork and piping with fire caulking, unless otherwise stated(refer to wall rating legend). v. Pendent sprinklers are rendered ineffective when ceiling in which they are located is removed. Rerun and install fire sprinkler for each room to meet fire code requirements. w. New Electrical Runs: Provide 3#10 and 1#10 ground in 3/4 " conduit panel. Provide 3P, 20A circuit breakers. Provide electrical to new units. x. Remove and dispose of existing ductwork. Patch wall penetrations to match existing. Contractor will need to coordinate new ductwork with existing ductwork in ceiling. y. Install new Fan Coil Units and supply thermal units (cooling only) per drawings. Provide and install 4-pipe fan coil unit. Coordinate exact location, height, with existing wiring, and ductwork. Refer to schedule for airflow and hydronic water flow requirements. Chilled water and Hot water piping. Provide with hot water coil, 3way valve, circuit setter, provide with drain pan and secondary shutoff switch, provide condensate pump, motorized modular valve, provide 24V motor controls and overflow switch, Connect to closest electrical panel. Run new 3/4 " Hot Water Supply piping, and 3/4 " Chilled Water Piping to new units. Provide and install pressure controller displays on corridor side of wall. Provide and install associated pressure sensors. Pressure controller shall tie-into existing Siemen Building Management System (Graphic Controls). Will have Temp, Pressure and Humidity sensors in each room. PC (ATU controller), FE (Air Flow Controller), TE (Discharge Temp Sensor), T (Thermostat). Each unit shall be controlled with dedicated unit with standalone controller (tied into Energy Management System). All thermal units shall be pressure independent with velocity resets. All units shall be capable of Variable Air Volume or some may be constant volume. Maintain positive pressure in room. Dehumidification is controlled through a wall mounted humidistat installed in space. 2. RFI are due Thursday July 7, 2022, at 1:00 PM ET. 1. A site visit is scheduled for 10:00 AM, Tuesday July 5,2022, the West Patio, 1201 NW 16th Street, Miami, FL. 33125. Project Title: Renovate Sterile Clean Storage Rooms. Project Number: 546-18-106. Project Magnitude: IAW FAR 36.204 between $500,000.00 and $1,000,000.00 This solicitation will be evaluated in accordance with FAR 15.101-1 - Trade-Off Process. This acquisition is a 100% Total Set-Aside for Service-Disabled Veteran Owned Small Business (SDVOSB). Those companies submitting a proposal will be verified for SDVOSB status at https://www.vetbiz.va.gov. Bruce W. Carter Miami VA Medical Center is a smoke free facility. Contractors, to enter the Medical Center you must have a picture ID. All contractors are required to wear a face mask in accordance with Guidelines. Prior to entering the medical center all contractors will be screened in accordance with Guideline. The VA will NOT provide any PPE. Funds are not currently available for this procurement. No contract award will be made until appropriated funds are made available. g AT THE TIME OF PROPOSAL SUBMISSION, and at the time of award, interested contractors MUST be actively registered in the following databases: System for Award Management - https://www.sam.gov; VetBiz: https://www.vetbiz.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Warehouse / Distribution - Pre-Engineered Storage Building
$1,000,000.00
Public - Federal
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2022
September 7, 2022
1201 NW 16th St, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: Jul 06 2022
Miami, FL
--
Miami, FL
Bid Date: Jun 24 2022
Miami, FL
Bid Date: Aug 15 2022
Miami, FL
Bid Date: Jun 17 2022
Miami, FL
Bid Date: Jan 19 2023
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Jun 15 2022
Miami, FL
Bid Date: Aug 09 2022
Miami, FL
Bid Date: Aug 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.