Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a civil project in Miami, Florida. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.
As of June 26, 2023, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2027. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Oral Presentation Professional Liability Insurance :$500,000.00 TRC Members (Subject to Change) : BaoYing Wang Nicholas Danu Pablo Orozco Financial Management Number(s) 44820612201 The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Advertisement Tentative Dates Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Scope of Services Meeting Date: Wednesday, April 20, 2022 Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: Wednesday, May 4, 2022 Tentative Oral Presentation Date: Thursday, May 5, 2022 Longlist Date/Time 4/12/2022 06:30 pm Shortlist Selection Date/Time 4/18/2022 07:30 pm Scope Meeting Date/Time 4/20/2022 06:30 pm Phase II Submittal Deadline Date/Time 5/11/2022 12:30 am Oral Presentation Date/Time 5/12/2022 Final Selection Date/Time 5/31/2022 07:30 pm Negotiations Period Begin Date 6/08/2022 Negotiations Period Ending Date 7/30/2022 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR 5/US-1 Long Key Bridge Over Long Key Channel
Conceptual
Roads / Highways
$241,223,765.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
Bid Date: Jul 06 2022
Miami, FL
--
Miami, FL
Bid Date: Jun 24 2022
Miami, FL
Bid Date: Aug 15 2022
Miami, FL
Bid Date: Jun 17 2022
Miami, FL
Bid Date: Jan 19 2023
Miami, FL
Bid Date: Jun 28 2022
Miami, FL
Bid Date: Aug 16 2022
Miami, FL
--
Miami, FL
Bid Date: Aug 09 2022
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Jun 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.