BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Georgetown, California. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The District's intent is to update the current Waste Discharge Requirement. Auburn Lake Trails Wastewater Management Zone - Waste Discharge Requirement Update. The Georgetown Divide Public Utility District (the District) is soliciting proposals from qualified Consultants to perform an evaluation and update of Waste Discharge Requirement, No. R5-2002-0031 (the Order, Attachment A). The District will use a "Qualifications Based Selection" process in determining which firm to select for the contract. The process will include an evaluation and ranking of firms based on set evaluation criteria. The District will open and review the proposals to establish the top ranked firm. If for any reason an acceptable contract cannot be negotiated with the top ranked firm, negotiations will commence with the next- highest ranked firm. The District reserves the right to retain all proposals submitted and to use any ideas in a proposal regardless of whether that proposal is selected. Proposals submitted will be evaluated by individuals from the District and/or outside agencies. During the evaluation process, the District reserves the right, where it may serve the District's best interest, to request additional information from proposers, or to allow corrections of errors of omissions. Submission of a proposal indicates acceptance by the firm of the conditions contained in this Request for Proposals (RFP), unless clearly and specifically noted in the proposal submitted and confirmed in the contract between the District and the firm selected. The District reserves the right, without prejudice, to reject any or all proposals. Deadline for Questions April 15, 2022 Response to Questions April 22, 2022 Final Consultant Selection Anticipated June 14, 2022 If you have any questions regarding this RFP, prior to April 15, 2022, please contact: Adam Brown, Operations Manager Email: abrown@gd-pud.org The Method of Contractor Selection has not been determined at this time.

Conceptual

Water / Sewer

$1,500,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
49
Bidding Soon
983
All Active Projects
400
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

img_map_placeholder

To Be Determined, Georgetown, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.