BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Jose, California. Completed plans call for site work for a water / sewer project.

The Project entails demolition of existing 8" fire water line to the theater, demolition of existing 3" domestic water line to the theater, demolition of existing concrete valve boxes, installation of new underground fire water service to the building. Reconnect new piping to existing fire riser in basement of building. Reconnect to existing Fire Department connection. Install new backflow preventer for fire water service. New backflow preventer shall be installed on new concrete pad and shared with domestic water BFP. Install new tamper switches on fire water backflow preventer and connect to BMS. Install new underground domestic water service to the theater. Connect new piping to existing domestic water piping in basement of building. Installation of new backflow preventer for domestic water service. Installation of new domestic water shut-off valve in new concrete valve box. Contractor must coordinate its work with a scheduled power shut-down, as well as ongoing day-to-day operations of an active school site. This project requires Prevailing Wages and is covered by the District's Construction Careers Agreement with the Santa Clara and San Benito Building & Construction Trades Council. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Q&A Deadline 04/07/2022 5:00 PM (PDT) If the Notice to Proceed is not issued on May 23, 2022, then the 100 calendar days shall be reduced and the substantial completion date of May 23, 2022and all Construction Milestone substantial completion dates shall still remain in effect as the contract requirement determent, for the project. District may reject the Bid Proposal submitted by such Bidder as being nonresponsive

Award

Water / Sewer

$322,860.00

Public - City

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
69
Bidding Soon
1,467
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

May 23, 2022

img_map_placeholder

Multiple Locations, San Jose, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.