BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of an educational facility in Floresville, Texas. Completed plans call for the renovation of a educational facility.

Each project scope is fully set out in Drawings and Specifications prepared by KCA Engineers, Inc. of San Antonio, TX. Contingencies shall be included in the Base Proposal to cover the cost of hidden/concealed conditions, or betterment of the respective project as deemed by the Owner. Contractor shall be allowed to recover all costs related to the completion of work under this contingency, however, no overhead or profit will be allowed in the Contractor's Cost Proposals paid out of this contingency. All remaining contingency balance shall be returned to Owner at the completion of the project without fee or charge (effectively reducing the initial construction contract amount). All questions (including requests for alternate product manufacturers) must be submitted to mkyler@ kcaeng.net no later than 2:00 pm on Tuesday, March 29, 2022. FINAL Addendum shall be issued via individual emails, on or before 2:00 pm on Thursday, March 31, 2022.

Post-Bid

Educational

$600,000.00

Public - City

Renovation

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
77
Bidding Soon
1,564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

April 20, 2022

Project location map

2000 Tiger Ln, Floresville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.