Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 8, 2025 at 7:00 PM
Updated December 9, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Hood River, Oregon. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Project is to replace the existing bridge with PDB delivery method and improve connectivity and the multi-modal transportation of people and goods across the Columbia River between the communities of White Salmon and Binge, Washington and Hood River, Oregon. As of December 8, 2025, final design is underway. Construction will begin October 2027. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Post-Bid
Bridges / Tunnels
$520,000,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2024
October 4, 2027
To Be Determined, Hood River, OR
Related To This Project
Hood River, OR
Bid Date: Jun 09 2022
Hood River, OR
Bid Date: May 03 2022
Hood River, OR
Bid Date: Jul 07 2022
Hood River, OR
--
Hood River, OR
Bid Date: Aug 18 2022
Hood River, OR
Bid Date: Aug 11 2022
Hood River, OR
Bid Date: Jan 27 2023
Hood River, OR
Bid Date: Sep 19 2024
Hood River, OR
Bid Date: Apr 29 2022
Hood River, OR
--
Hood River, OR
Bid Date: Jan 17 2023
Hood River, OR
Bid Date: Dec 07 2023
Hood River, OR
Bid Date: Nov 16 2022
Hood River, OR
Bid Date: Nov 17 2022
Hood River, OR
Bid Date: Oct 04 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
