Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a road / highway in Washington, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The work to be performed consists, in general, of reconstruction of the existing pavement and curb returns, and miscellaneous concrete improvements. Other such items and details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions shall be performed, placed, constructed, or detailed. Bids are required for the entire work described herein. The Contractor shall posses a Class A license at the time this contract is awarded. This contract issubject to state contract non-discrimination and compliance requirements pursuant to Government Code Section 12990 Bids shall be accompanied by a Proposal Guaranty of a certified check or bidders bond of not less than 10 percent (10%) of the total amount of the bid, made payable to the order of the City of Waterford, to be retained as liquidated damaged by the Owner if the successful bidder fails to enter in to a Contract. Upon entering into a contract, the successful bidder will be required to furnish a Performance Bond and a Payment Bond each for 100 percent of the contract amount. The City of Waterford hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement any disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Pursuant to Section 1773 of the Labor Code, the general prevailing rate of wages in the County in which work is to be done has been determined by the Director of the Department of Industrial relations. These wage rates and the Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the serially numbered books issued for bidding purposes entitled "Proposal and Contract", and in the copies of said book that may be examined at the offices described above where project plans, special provisions, and proposal forms may be seen. Addenda to modify rates, if necessary, will be issued to holders of "Proposal and Contract" books. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates Attention is directed to the Federal minimum wage rate requirements in said books entitled "Proposal and Contract". If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wages not specifically included in the Federal minimum wager determinations. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determinations otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall not pay less than the Federal minimum wage rate which most closely approximates the duties of the employees in question. The Owner reserves the right to reject any or all bids, or to waive any informalities. If awarded, a contract will be awarded within 10 days of the bid opening. The Contract shall be signed within 14 calendar days; not including Sundays and legal holidays, after receipt of the Notice of Award, and work shall be completed within 45 calendar days after Notice to Proceed. For any moneys earned by the Contractor and withheld by the City of Waterford to ensure the performance of the contract, the Contractor may, at his request and expense, substitute securities equivalent to the amount withheld in the form and manner and subject to the conditions provided in Sections 22300 and 10263 if the Public Code of the State of California. work shall be completed within 45 calendar days after Notice to Proceed.
Bid Results
Roads / Highways
$402,332.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2022
May 20, 2022
Multiple Locations, Washington, CA
Related To This Project
Santee, CA
--
Mountain View, CA
--
Fremont, CA
Bid Date: Apr 26 2022
Los Angeles, CA
--
Novato, CA
Bid Date: Apr 21 2022
Jackson, CA
Bid Date: May 26 2022
Valley Center, CA
--
Vista, CA
--
Palmdale, CA
Bid Date: May 26 2022
Burbank, CA
Bid Date: May 26 2022
Cupertino, CA
Bid Date: May 26 2022
Palmdale, CA
Bid Date: May 26 2022
Anaheim, CA
Bid Date: May 26 2022
San Clemente, CA
Bid Date: May 26 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
