BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Mauston, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

AET Project No. P-0008434 The work for which bids are asked includes the following: Structure Replacement: Removal of an existing single span bridge and construction of a new 37-foot long single span concrete bridge, rip rap, railing and reconstruction of 50-feet of roadway on either side of the bridge. Roadway Reconditioning: Pulverize approximately 4,000 linear feet of a rural lane roadway, grade the existing base to accommodate a proposed 24-foot wide asphalt pavement roadway with 3-foot gravel shoulders, beam guard including energy absorption terminals, long span over culverts, standard MGS Type 3, and thrie beam connection to the structures, installation of approximately 1,000 linear feet of 30-inch concrete curb and gutter, three 68-foot long, 48-inch diameter relief culverts, unclassified excavation, supplemental dense graded base, 500 lineal feet of small diameter storm sewer and storm inlets, approximately 2,500 tons of asphaltic concrete pavement, and all related turf restoration for a complete project. The anticipated substantial completion date is September 30, 2022, and final completion date is October 15, 2022. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at http://www.wdol.gov/dba.aspx#0. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates the use of Community Development Block Grant (CDBG) Funding. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. OWNER reserves the right to waive any informalities or to reject any or all bids.

Award

Bridges / Tunnels

$987,652.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
19
Bidding Soon
404
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 16, 2022

img_map_placeholder

Multiple Locations, Mauston, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.