Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Long Beach, California. Completed plans call for site work for a water / sewer project.
Respondents are invited to provide to the Long Beach Water Department proposals for RFP for Construction Management Services for the Spinnaker Bay Drive Water Main Replacement Project Phase 1 Respondents can register at website to view and download the request for proposal. Project No. 220108.1 LBWD anticipates the start of construction of the Project in May 2022. The construction cost for the Project is $3,860,322. Project includes construction of new 6-inch, 8-inch, and 12-inch polyvinyl chloride (PVC) pipe, wax tape of ductile iron flanges, tape wrap and polyethylene wrapped ductile iron fittings, couplings, thrust blocks, valve anchors; installation of 6-inch, 8-inch, and 12-inch gate valves; installation of 12-inch insertion valves; installation of 1-inch and 2-inch water services, fire services and air relief valve assemblies; installation of fire hydrant assemblies; installation of 2-inch blow-off assemblies; connections to existing water mains; installation of PVC casing; relocation of existing sewer laterals; abandonment of existing water main, services, valves and fire hydrant laterals; removal and disposal of existing fire hydrant head and bury; appurtenant items such as traffic control, pavement removal and replacement, excavation, backfill and compaction, pressure testing and disinfection, and all other work necessary to complete this project complete under the direction of the Long Beach Water Department.
Post-Bid
Water / Sewer
$3,860,322.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2022
May 2, 2022
Spinnaker Bay Dr, Long Beach, CA
Related To This Project
Long Beach, CA
Bid Date: Apr 13 2022
Long Beach, CA
Bid Date: Mar 29 2022
Long Beach, CA
Bid Date: Apr 06 2022
Long Beach, CA
Bid Date: Sep 09 2021
Long Beach, CA
Bid Date: May 23 2022
Long Beach, CA
Bid Date: Jun 15 2022
Long Beach, CA
--
Long Beach, CA
Bid Date: Apr 11 2022
Long Beach, CA
Bid Date: May 05 2022
Long Beach, CA
Bid Date: Apr 21 2022
Long Beach, CA
Bid Date: May 11 2022
Long Beach, CA
--
Long Beach, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.