BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Millbury, Massachusetts. Completed plans call for site work for a water / sewer project.

Landscaping Replacement at Upper Blackstone. Remove existing landscaping on the steep hillside and replace with new soil and hydroseed wildflower mix. The existing landscaping to be removed is on a steep hillside and includes hedges, crushed stone and scrubby brush. The wildflower hydroseed mix shall be suitable for the location intended. Total area of project is approximately 8,200 sf. Remove existing landscaping on the steep hillside behind the Administration Building and replace with new soil and hydroseed wildflower mix at the Upper Blackstone Clean Water facility. The existing landscaping to be removed is on a steep hillside and includes hedges, crushed stone and scrubby brush. Remove material to approximately 6" below grade and dispose of excess material offsite. Near the base of the hill, an approximately four-foot wide row of 6" +/- riprap shall be installed. Site visits are encouraged to view the terrain. The wildflower hydroseed mix shall be suitable for the location intended. Total area of project is approximately 8,200 sf.

Bid Results

Water / Sewer

$67,900.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
666
Active Projects
235
Bidding Soon
4,886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2022

May 13, 2022

Project location map

50 US-20, Millbury, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.