BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Millbury, Massachusetts. Completed plans call for the renovation of a fire / police facility.

The Town of Millbury, the Awarding Authority, invites sealed bids for Elevator and Glass & Glazing Sub Contractors for construction of new Millbury Fire Station, Millbury, MA in accordance with Contract Documents prepared by Context Architecture: 65 Franklin Street, Boston, MA 02110. Glass & Glazing Filed sub-bidders must be Pre-Qualified and DCAMM certified. Elevator Filed sub-bidders must be DCAMM certified. Contractor Qualification DCAMM Certificate MBE: 10 percent of the contract price; WBE: 4 percent of the Contract price. The Town of Millbury, Massachusetts is proposing to construct a new approximately 22,000 SF Fire Station. The existing building on the site will be demolished. Refer to Drawings and Specifications for scope of work. 1.The project is a new fire station of approximately 21,700 sf on 2 floors. 2. All new utilities will be provided to the building. A diesel fired generator will be set on site. 3. The site will be occupied by the existing fire operations. Due to fire operations and neighborhood considerations the contractor will be required to submit logistics plans indicating temporary facilities, laydown, staging, and proposed trucking routes for deliveries and debris removal.

Post-Bid

Fire / Police

$14,000,000.00

Public - City

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
181
Bidding Soon
3,260
All Active Projects
1,352
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

July 18, 2022

img_map_placeholder

To Be Determined, Millbury, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.