BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2022 at 8:00 PM

Updated June 14, 2024

Renovation of a stadium in Pasadena, California. Completed plans call for the renovation of a stadium.

**As of June 10, 2022, project has not been awarded and no timeline of award was established.** The final date to submit questions regarding this project will be April 14th at 5:30 p.m Online Q&A No Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% The Brookside Golf Courses are bordered by Rosemont Avenue on the east, Washington Boulevard on the north and West Drive on the west. These three streets are considered part of the Rose Bowl Loop. The RBOC is seeking the services of a qualified firm to furnish labor and materials to manufacture and install a test project consisting of 450 lineal feet of a15-foot-tall fence with a 20-foot overhang cantilever netting at Brookside Golf Course, at the intersection of West Drive and Salvia Canyon Road

Bid Results

Arenas / Stadiums

$219,600.00

Public - City

Renovation

4

4

9

6

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
264
Bidding Soon
3,813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

May 23, 2022

Project location map

1001 Rose Bowl Dr, Pasadena, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.