BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2022 at 8:00 PM

Updated March 27, 2024

Site work for a water / sewer project in Stuart, Florida. Completed plans call for site work for a water / sewer project.

As of May 26, 2022, a general contractor has been awarded. A timeline for construction has not been confirmed. The work covered within the contract consists of the removal and disposal of two (2) existing concrete floating dock finger piers and the installation of two (2) new Golden Marine 850 series floating dock finger piers to the existing floating dock. The project is located at the City of Stuart's public use floating courtesy dock located at 121 SW Flagler Ave. in the City of Stuart, Florida *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$49,690.00

Public - City

Site Work

4

3

14

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
84
Bidding Soon
1,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

May 20, 2022

Project location map

121 SW Flagler Ave, Stuart, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.