BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a road / highway in Cape Girardeau, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Question & Answer deadline: Apr 08, 2022 (Fri), 12:00 PM The improvements consist of removal of existing curbs, sidewalk, and street pavement, clearing and grubbing within the project limits, site preparation and grading, storm sewer construction, MSE retaining walls, chain link fencing, street and sidewalk paving, site restoration and other related improvements as indicated on the Project Plans or within the Project Documents prepared by Koehler Engineering and Land Surveying, Inc. and dated March 25th , 2002, for the Construction of College Street between the west line of Minnesota Avenue and the east line of West End Boulevard.

Bid Results

Roads / Highways

$602,750.00

Public - City

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
40
Bidding Soon
616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

May 12, 2022

Project location map

College St, Cape Girardeau, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.