BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Gardner, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The removal and replacement of the existing hot mix asphalt pavement parking lot, preparation of existing aggregate base course, PCC sidewalk removal and replacement, storm sewer installation, and pavement markings. The successful Bidder shall provide at least 40% of all labor required for the completion of this project. Bids may be held by the School District for a period not to exceed 30 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Owner reserves the right to accept or reject any or all Bids and to waive any informalities in the bidding.

Bid Results

Sidewalks / Parking Lot

$229,150.00

Public - City

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
237
Bidding Soon
3,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

June 1, 2022

Project location map

500 E Main St, Gardner, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.