BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Balsam Lake, Wisconsin. Completed plans call for site work for a bridge / tunnel.

Replacing the 150th Ave culvert as described by the plans and scope of work discussed in the Special Provisions. This project includes replacing two 48 concrete culverts with an aluminum arch (box) culvert. With coordination with the Town of Balsam Lake, the road may be closed for up to a week during construction. Flows at this location are generally low and shallow. Silt screen and cofferdams will need to be installed and rearranged periodically during construction phasing. In preparation for installation, the area for culvert placement must be slightly over-excavated for placement of the open graded base. Any removed materials may be placed on the roadway, but must be protected from eroding into the nearby waterway or wetlands. See the culvert installation sequence on page 3 of the plan set. Please note that the headwalls of the culvert may not be "standard" height on this model culvert. For this project, they should extend 3' above the arch to ultimately provide a safe flat recovery area for vehicles on top of the culvert. The contractor will be responsible for culvert assembly. Contractor should refer to the product manual for proper assembly, but a staff member from Contech will be periodically available on site for guidance. The contractor shall coordinate with the staff member as necessary. An optional pre-bid meeting will be held at the project site on April 12, 2022, at 10:00 am. The project engineer will be present to answer questions and tour the project site. Attendees must pre-arrange attendance with Dan Mortensen of Cooper Engineering prior to April 11th.

Bid Results

Bridges / Tunnels

$97,665.00

Public - City

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
74
Bidding Soon
742
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

May 23, 2022

img_map_placeholder

150th Ave, Balsam Lake, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.