BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Milbank, South Dakota. Completed plans call for site work for a water / sewer project.

Sealed Bids for the construction of the Ground Storage Reservoir Improvements 2022 project. Project consists of constructing the following: Surface preparation and recoating of interior of carbon steel ground storage reservoir. Interior shall be abrasive blasted and completely coated with zinc-rich primer and a single full coat of epoxy, a stripe coat of epoxy shall be applied after primer; Surface preparation and recoating of exterior of carbon steel ground storage reservoir. Exterior shall be abrasive blasted and completely coated with zinc-rich primer, intermediate coat of polyurethane and a top coat of fluoropolymer, with a stripe coat of epoxy shall be applied after primer; New Fail-Safe Vent No bids will be received after the specified hour and date, and Bids which are not prepared and filed in accordance with Instructions to Bidders may be rejected. Upon request, in accordance with South Dakota Codified Law 5-18B-1, one copy of electronic or paper Plans and Specifications shall be furnished, without charge, to each Prime Contractor resident in South Dakota who intends, in good faith, to submit a bid to the Owner. Additionally, if a paper copy is provided under the conditions of SDCL 5-18B-1, in consideration of the documents being provided at no charge, unsuccessful bidders agree to return the documents to the office of Banner Associates, at the address listed above, within thirty (30) days after the bid opening. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. The Bid security will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein. The Work will be substantially complete on or before October 15, 2022 ; General Conditions on or before November 30, 2022.

Bid Results

Water / Sewer

$324,415.00

Public - City

Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
88
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2022

June 6, 2022

img_map_placeholder

To Be Determined, Milbank, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.