BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tybee Island, Georgia. Working plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and sidewalk / parking lot.

No responses submitted for project. City will meet to discuss if there will be plans to rebid. Direct all questions in writing to Peter Gulbronson at peter.gulbronson@cityoftybee.org. The City of Tybee Island, GA may (i) reject any, any part of, or all bids and proposals with any party submitting a bid or proposal, or (ii) waive informalities and technicalities, (iii) negotiate directly with any party submitting a bid or proposal, or (iv) accept that proposal which the City of Tybee Island, GA deems to be in its best interest, whether or not it is the lowest dollar proposal The project consists ofthe fill coastal marshlands associated with a portion of Polk Street that is a dedicated City ofTybee Island (COTI) Right of Way (ROW) and to fill coastal marshlands for construction of a private residential driveway. The project consists of placement offill within the 769 linear feet of project corridor within CMPA jurisdiction to construct a single 8ft. wide vehicular travel lane with elevations at 7.0ft. NAVD29 for the crest ofthe gravel road and 6.8ft. NAVD29 at the transition point ofthe shoulder and slope. The minimum and maximum footprint width in CMPAjurisdiction for the roadway will vary from 12ft. to 21.75ft., respectively. The project also includes the installation ofthree (3) 18-inch culverts that measure 21.15 linear feet, 19.35 linear feet and 15 linear feet respectively, to allow flow oftidewater from Eastern Salt Marsh (ESM) and Western Salt Marsh (WSM) associated with Chimney Creek. Permanent impacts associated with the placement offill for a 230 linear foot private driveway private driveway total approximately 0.095 acres. Permanent impacts associated with fill ofthe 539 linear feet ofCOTI Polk Street ROW total approximately 0.26 acres. Total impacts to coastal marshlands for the proposed project are approximately 0.355 acre ofCMPAjurisdictional area. Standard and Special conditions apply to this permit.

Final Planning

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
43
Bidding Soon
503
All Active Projects
234
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2022

February 8, 2023

img_map_placeholder

Multiple Locations, Tybee Island, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.