Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 10, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a road / highway in Springville, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The work to be performed shall include furnishing all necessary materials, equipment, facilities, services and appurtenances thereto needed for the complete construction of the project. The Work generally includes, but is not limited to, the following: Part A: Full profile mill and overlay of 400 South Street from 1300 East to 1950 East including the entire roundabout. Work shall consist of a 1.5 inch profile mill of the entire roadway, placement of a 1/2 " asphaltic leveling course, placement of a geotextile interlayer (in travel lanes), placement of a 2-inch overlay over the entire roadway surface, and the lowering, raising and collaring of existing manholes and water valves in the project area. The project will also include the complete removal and replacement of approx. 1550 SF of asphalt complete, and the placement of approx. 3220 SF of 8-inches of base and 4-inches of asphalt. Part B: Edge mill and overlay of Meadowlark Lane from 1000 East to Canyon Avenue. Work shall include an 8-feet wide edge mill to 1.5 inches below lip of gutter along the perimeter of the project limits, placement of a 1/2 " asphaltic leveling course, and placement of a 2-inch overlay over the entire roadway surface, the lowering, raising and collaring of existing manholes and water valves in the project area. Part C: Construction of an approx. 1/2 acre asphalt parking area at the wastewater treatment plant (700 N 500 East). Work shall include the removal of existing asphalt driveway and saw cutting existing asphalt edge with off-site disposal, remove, survey and grade soil down 9-inches and dispose on-site, build a 2-ft high berm on the west side with the deleterious material, place 6-inches base and 3-inches asphalt concrete. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Question Submission Close Date 4/13/2022 12:00 PM MDT
Post-Bid
Roads / Highways
$1,200,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2022
May 31, 2022
400 S, Springville, UT
Related To This Project
Springville, UT
Bid Date: Jan 26 2022
Springville, UT
Bid Date: Jul 09 2020
Springville, UT
Bid Date: Jun 07 2022
Springville, UT
Bid Date: Jun 15 2022
Springville, UT
Bid Date: May 03 2022
Springville, UT
Bid Date: Jul 22 2022
Springville, UT
--
Springville, UT
Bid Date: Jun 15 2022
Springville, UT
--
Springville, UT
--
Springville, UT
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
