BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Springville, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be performed shall include furnishing all necessary materials, equipment, facilities, services and appurtenances thereto needed for the complete construction of the project. The Work generally includes, but is not limited to, the following: Part A: Full profile mill and overlay of 400 South Street from 1300 East to 1950 East including the entire roundabout. Work shall consist of a 1.5 inch profile mill of the entire roadway, placement of a 1/2 " asphaltic leveling course, placement of a geotextile interlayer (in travel lanes), placement of a 2-inch overlay over the entire roadway surface, and the lowering, raising and collaring of existing manholes and water valves in the project area. The project will also include the complete removal and replacement of approx. 1550 SF of asphalt complete, and the placement of approx. 3220 SF of 8-inches of base and 4-inches of asphalt. Part B: Edge mill and overlay of Meadowlark Lane from 1000 East to Canyon Avenue. Work shall include an 8-feet wide edge mill to 1.5 inches below lip of gutter along the perimeter of the project limits, placement of a 1/2 " asphaltic leveling course, and placement of a 2-inch overlay over the entire roadway surface, the lowering, raising and collaring of existing manholes and water valves in the project area. Part C: Construction of an approx. 1/2 acre asphalt parking area at the wastewater treatment plant (700 N 500 East). Work shall include the removal of existing asphalt driveway and saw cutting existing asphalt edge with off-site disposal, remove, survey and grade soil down 9-inches and dispose on-site, build a 2-ft high berm on the west side with the deleterious material, place 6-inches base and 3-inches asphalt concrete. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Question Submission Close Date 4/13/2022 12:00 PM MDT

Post-Bid

Roads / Highways

$1,200,000.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
94
Bidding Soon
1,002
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

May 31, 2022

Project location map

400 S, Springville, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.