Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Waterville Valley, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and bridge / tunnel.
The Project consists of two phases: Phase 1: Reconstruction in place of approximately 2,300 linear feet of Snow's Brook Road between the two Village Road Intersections, with minor culvert replacements. Phase 2: Reconstruction of approximately 1,000 linear feet of Valley Road (from Tripoli Road to Tecumseh Road), 1,300 linear feet of Tecumseh Road (from Valley Road to Snow's Brook Road) and 1,100 linear feet of Snow's Brook Road (from Tecumseh Road to Village Road). Phase 2 improvements include drainage upgrades and the addition of pedestrian/bicycle facilities. The Contractor shall have obtained at least one set of electronic plans and specifications from HEB Engineers to be considered a responsive Bidder. The Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, and to negotiate contract terms with the Successful Bidder, and the right to disregard all non-conforming, non-responsive, unbalanced or conditional Bids. Also, Owner reserves the right to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid package is non-responsive, or the Bidder is unqualified or of doubtful financial ability, or fails to meet any other pertinent standard or criteria established by Owner. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. The Phase 1 Engineer’s Opinion of Probable Construction Cost is between $750,000 and $900,000. The Phase 2 Engineer’s Opinion of Probable Construction Cost is between $1,000,000 and $1,200,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$2,181,472.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2022
May 6, 2022
Multiple Locations, Waterville Valley, NH
Related To This Project
Waterville Valley, NH
Bid Date: Apr 01 2021
Wolfeboro, NH
Bid Date: Apr 26 2022
Londonderry, NH
Bid Date: Apr 26 2022
Wakefield, NH
Bid Date: Mar 11 2022
Laconia, NH
Bid Date: Apr 19 2022
Exeter, NH
--
Concord, NH
--
Portsmouth, NH
--
Portsmouth, NH
--
Portsmouth, NH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.