BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in State College, Pennsylvania. Completed plans call for the renovation of a 140,600-square-foot, six-story above grade educational facility.

A new Liberal Arts Building with a steel structure and brick facade. The building will be approximately 140,600 sq. ft. with 6 floors and contain general-purpose classrooms, instructional laboratories, dry (data-driven) research space, wet (fume hood) research space, museum/collections space, faculty offices, graduate offices, and administrative support areas. Turner Construction is the Construction Manager for the upcoming new Penn State Liberal Arts Research & Teaching Building, LARTB, Project in State College, PA at the University Park Campus. This project encompasses construction of the new building followed by demolition of the existing Oswald Tower Building with site restoration to "greenspace". The LARTB will be located between the Donald H. Ford Building and Mateer Building, along West Park Avenue. The building will house: o Several College of the Liberal Arts academic departments, including Anthropology, Sociology & Criminology, Political Science and the School of Public Policy o Population Research Institute o School of International Affairs o General Instructional Classrooms o Matson Museum of Anthropology The building will be approximately 140,600 sq. ft. and contain general purpose classrooms, instructional laboratories, dry (data driven) research space, wet (fume hood) research space, museum/collections space, faculty offices, graduate offices and administrative support areas. Structural Steel and Stairs $6M-$7M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$128,000,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
410
All Active Projects
167
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

June 27, 2022

img_map_placeholder

To Be Determined, State College, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.