Renovation of a municipal facility in Houston, Texas. Completed plans call for the renovation of a municipal facility.

As of May 2, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The area is a 42'x82' square of flooring in the internal machine shop, the area consists of joints and different areas of concrete where the floors have been broken up and replaced. The concrete is saturated with oil in some areas and has many imperfections. There are multiple floor protrusions that provide electrical for the machinery. PORT HOUSTON WILL REMOVE ALL MACHINERY PRIOR TO START OF WORK. o SHOT BLAST and completely vacuum area to a smooth dustless state to provide a superior penetration of vapor barrier coating minimizing pits and floor imperfections floor must be compatible to ASTM C722 -18 standards for monolithic coatings. Preparations for a Citadel epoxy/polyurea/polyurethane floor coating system. Areas of the floor will need an inspection for uneven areas. These must be floated to a smooth surface prior to the coatings. o APPLY 1 coat of Citadel Ultra Hydro Stop H20 vapor barrier applied at 150 SQ FT per Gallon. o Areas that need floating are to be floated on top of the vapor barrier using Citadel SLE100, being a 100% solids epoxy with added fumed silica or cellulose at a rate determined to fill imperfections. (Inspection prior to the bid may be required) o APPLY 1 coat of 2-part Citadel Poly350 polyurea pigmented to match texture color as the primer coat, applied at 150 SQ FT per Gallon. o Apply a full broadcast of the selected 1/4" texture color. TBD o Scrape, sand and clean up excessive and loose texture prior to topcoats. o APPLY 1 coat of 2-part Citadel RG80 Polyaspartic as the build coat on top of texture, applied at 120 SQ FT per Gallon. o APPLY 1 coat of 2-part Citadel RG80 top coat applied at 350 SQ FT per Gallon o Add a #240 mesh Aluminum Oxide with final coat at 1 lb. per gallon of urethane for desired scratch resistance: Floor preparation and installation of coating with anti-slip additive to create a safe non-slip surface for the port of houston authority (pha) turning basin terminal equipment machine shop located at 7300 clinton drive, gate 8, houston, tx 77020. Site visit not mandatory; contractor must be certified by citadel floors as an installer of their products and must produce a certificate as licensed installer directly from citadel floors; mininum 5 year workman warranty; product warranty supplied by citadel floors; contractor is responsible for having valid identification for every worker that comes into 7300 clinton drive, the requirements may be obtained at porthouston.Com/port-security/safety-and-credential-information; workers hours are from 8:00 am to 12:00 pm and 1:00 pm to 5:00 pm weekdays. Project will be supervised by port personnel. If work hours go into an overtime (12-I pm) that evolution must be approved by the maintenance manager 24 hours prior to the start of day. Contractor must get approval to work from the maintenance manager at least 72 hours prior to arrival and will have 7 consecutive days to complete these repairs. Contractor should be able to ensure vapor barrier has 12 hours to cure fully before applying the build coat. Contractor must provide hookups and equipment, notably generators, if their equipment isn't compatible with a standard 115v/15a circuit. Project amount not to exceed $48,500. Project scope and product data sheets are attached. Please direct all inquiries via the question-and -answer section of the proposal; no phone calls or emails

Post-Bid

Municipal

$48,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
61
Bidding Soon
2,748
All Active Projects
1,063
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2022

May 18, 2022

img_map_placeholder

7300 Clinton Dr, Houston, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.