BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2022 at 8:00 PM

Updated April 24, 2025

Site work and paving for a civil project in South Lake Tahoe, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

As of 5/13/2022, The County of El Dorado, Department of Transportation (Transportation) regretfully cancels the invitation for bids for the San Bernardino Class 1 Bike Trail Project (Project). Transportation would like to thank all Planholders for their interest and patience on the above referenced Project. Pursuant to the provisions of El Dorado County Ordinance code 3.14.080 and California Public Contract Code 22038, Transportation intends to re-evaluate the cost estimates for this Project and re-bid the Project this year. All prospective bidders will be notified when the Project is being re-advertised for bid. The County of El Dorado, Department of Transportation (Transportation) regretfully cancels the invitation for bids for the San Bernardino Class 1 Bike Trail Project (Project). Transportation would like to thank all Planholders for their interest and patience on the above referenced Project. Pursuant to the provisions of El Dorado County Ordinance code 3.14.080 and California Public Contract Code 22038, Transportation intends to re-evaluate the cost estimates for this Project and re-bid the Project this year. All prospective bidders will be notified when the Project is being re-advertised for bid. The Work to be done is shown on the Plans, and generally consists of, but is not limited to: Construct a Class 1 shared use trail. The project includes an 8-foot wide paved path with 2-foot aggregate base shoulders, precast concrete boardwalk system, tubular steel railing, and a prefabricated bridge (approximately 12 feet wide and 140.25 feet long) over the Upper Truckee River. Construction also includes clearing and grubbing, tree removal, excavation and grading, asphalt concrete paving, drainage improvements, bridge abutments, signing and striping, pavement markings, revegetation, dewatering, traffic control, and temporary erosion control. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. This is a one hundred (100) working day Project.

Award

Roads / Highways

$3,032,393.00

Public - County

Paving, Site Work

50

18

3

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
59
Bidding Soon
781
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2022

September 13, 2022

Project location map

Multiple Locations, South Lake Tahoe, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.