BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a sidewalk / parking lot in Florissant, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

SCOPE OF WORK: Supply labor, material and equipment for all asphalt overlays. All work to be performed in a thorough and workmanlike manner by mechanics skilled in their respective trades, using materials specified, or materials approved by the school district as equal in quality, capacity, and performance to those specified. INTERFERENCE WITH OPERATION: The contractor shall confine his activities to the area set aside for him to do his work and shall not interfere with any of the owner's activities. The contractor will not be permitted to store material except within the areas as directed by the owner. Should any disturbance of existing installation be necessary, the contractor shall so inform the owner well in advance of the time contemplated for the disturbance. After a plan acceptable to the owner has been formulated, the contractor shall keep in close personal contact with the work to see that it is executed in accordance with the agreed procedure. Prior to final acceptance, the contractor shall restore all areas affected by his work to original state of cleanliness and shall repair all damage to premises and grounds caused by his workmen and equipment. GUARANTEE Contractor shall guarantee his work against defects in materials, workmanship and equipment, for a period of one (1) year from date of final acceptance and/or final payment. 13. If the proposal exceeds $10,000, the contractor shall submit with the proposal a cashier's check, certified check or acceptable bidder's bond payable to the school district in an amount not less than 5% of the amount of the bid submitted, as a guarantee that if awarded the contract the bidder shall promptly enter into a contract and execute such bonds as required. The owner shall require the successful bidder to furnish a Performance Bond and Labor and Materials Payment Bond prior to the execution of the contract. The bonds shall be written in the amount of 100% of the total contract price. The mentioned work will needed to be coordinated between June 1st, 2022 and August 1" 2022.

Award

Sidewalks / Parking Lot

$183,734.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
101
Bidding Soon
1,295
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2022

June 1, 2022

Project location map

Multiple Locations, Florissant, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.