Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 1, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Big Piney, Wyoming. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Project generally consists of Installation of new water distribution line, valves, fire hydrant, service connections, asphalt pavement, concrete curb and gutter, surface restoration and appurtenances in Big Piney, Sublette County, Wyoming. Questions regarding the Bidding Documents should be directed to Jorgensen Associates by phone at 307-367-6548.

Post-Bid

Water / Sewer

$510,000.00

Public - City

Paving, Site Work

17

17

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
10
Bidding Soon
144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

March 30, 2023

Project location map

S Nichols St, Big Piney, WY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed