BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a library in Trinidad, Colorado. Completed plans call for the renovation of a library.

INTRODUCTION/DESCRIPTION OF PROJECT The Trinidad State College Freudenthal Library Building is a 3-story, approximately 34,000 gross square-foot building, built in the 1940s, that currently houses multiple programming and departmental needs within the College. In 2021, the College completed a Program Plan to renovate and repurpose or reprogram the facility. The Program Plan identified numerous deferred maintenance, ADA and security issues, as well as space-use inefficiencies. The project consists of mainly interior improvements, though the Program Plan does identify recommended site improvements and a new main entry. The design shall adhere to Colorado Office of the State Architect, High Performance Certification Program criteria. A major component of this project is phasing. The building must remain occupied during construction, and as such, the design of the renovations must accommodate phased construction. Additionally, the building houses not only library collections, but archaeological and historical artifacts that must be preserved during construction and given a proper, climatecontrolled space within the new building layout. Trinidad State College intends to select a CM/GC for services in pursuit of Phase 1, as described in the Program Plan. The total project budget for Phase 1, including design and construction costs, is $6,276,339. The overall schedule/duration of the project is 24 months, with a 9-month design duration followed by 12-15 months of construction. Should Phase 2 of this project become appropriated, and upon satisfactory performance during Phase 1, the contracted firm may be asked to submit a proposal for the continuation of the additional phase. Refer to the Program Plan for a description of the work to be provided in each Phase. NV5 is currently engaged as the Owner's Representative (Project Manager) on the project. The College is currently negotiating contract with studiotrope Design Collective as the project Architect.

Post-Bid

Library

$150,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
10
Bidding Soon
90
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2022

January 1, 2023

Project location map

600 Prospect St, Trinidad, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.