Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 31, 2022 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Slinger, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.
Project involves on STH 60, the construction of 4,400 LF of a 5-foot asphaltic sidewalk, 250 LF of a 5-foot concrete sidewalk with ADA intersections, 250 feet chain link fencing, and restoration. Cedar Creek reconstruction includes 1,650 LF 5-foot concrete sidewalk, 5,475 S.Y. pavement pulverization, 1,750 L.F. pavement and milling, 4,100 L.F. curb and gutter, 2,000 ton asphalt pavement, storm sewer inlets, manholes and restoration. Project Manager for this Project is Sean M. Sullivan, P.E., who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188-1020, (262) 542- 5733 regarding the Project. All Work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of the Village of Slinger, and the Consulting Engineer during regular business hours. These documents may be downloaded by selecting this project from the PROJECT BIDS link under the RESOURCES tab and inputting Quest #8169552 in the website's Browse Projects Search field. Please contact QuestCDN at 952-233-1632 or info@Questcdn.com for assistance in free membership registration, downloading, and working with this digital project information. QuestCDN is the Issuing Office. Partial sets of Bidding Documents are not available. Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered to the Village of Slinger at least 5 days before the Bid opening date. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to the Village of Slinger as liquidated damages. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Slinger reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes.
Post-Bid
Sidewalks / Parking Lot
$550,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2022
May 30, 2022
Multiple Locations, Slinger, WI
Related To This Project
Slinger, WI
Bid Date: Jan 05 2023
Slinger, WI
Bid Date: Jun 23 2022
Slinger, WI
Bid Date: May 12 2022
Slinger, WI
Bid Date: Mar 17 2022
Slinger, WI
--
Slinger, WI
Bid Date: Feb 10 2023
Slinger, WI
Bid Date: Apr 12 2022
Slinger, WI
Bid Date: Apr 14 2022
Slinger, WI
Bid Date: Mar 21 2019
Slinger, WI
Bid Date: Apr 01 2020
Slinger, WI
Bid Date: Oct 27 2022
Prentice, WI
Bid Date: Apr 29 2022
Chippewa Falls, WI
Bid Date: May 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.