Published December 7, 2022 at 7:00 PM

Updated September 15, 2023

Site work for an educational facility in Winnipeg, Manitoba. Completed plans call for site work for a educational facility.

Replace the following 3 meters : 1 main steam meter from UofM to be replaced with E+H Prowirl F 200 series Vortex Flowmeter as per the utility meter specs provided by University of Manitoba. 1 main condensate Meter from UofM to be replaced with E+H Prowirl Vortex Flowmeter as per the utility meter specs provided by University of Manitoba. 1 main chilled water meter from UofM to be replaced with E+H Promag W 400 series Electromagnetic Flowmeter as per specs the utility meter specs provided by University of Manitoba. Installation of prerequisite sensors for above 3 meters. Installation of Direct Digital Computer (DDC) to interface with the Energy Flow computers (Steam, Chilled water & Condensate). The specs and the supplier have been specified by U.of M. and are reflected in the IFT Tender Package. Installation of additional backflow valves, as specified in the IFT Tender Package. As per UofM requirements we require Axon Automation to perform configuration and verification. Axon is the one who set up the radio frequency system at the UofM so they are required as a subtrade to perform setup and commissioning services including setup of the radio transmitter. Axon Automation, Kurtis Martineau (204) 295-2296 As part of commissioning the contractor is to coordinate with DFO operator and UofM physical plant to verify output signals are being received. Existing wiring may be reused between metering devices. All metering devices except for temperature sensors must be replaced. Temperature sensors do not need to be replaced so long as calibration is verified during meter commissioning. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform. bid value not released for publication.

Award

Educational

$200,000.00

Public - Federal

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Barriers and Enclosures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping Insulation, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
38
Bidding Soon
318
All Active Projects
128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2022

July 18, 2022

img_map_placeholder

501 University Crescent, Winnipeg, MB


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Utility Meter Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.